Our latest News

We like to ensure that all our customers and staff are kept up to date with our latest achievements, new product launches and future plans in our News section.

NEW PRODUCT – Electronic Outgoing MCCBs for Loadbank 250 Panel boards

Dorman Smith are pleased to announce the launch of improved Loadbank 250 400A & 800A MCCB Panel boards, which will allow the Loadline YA3S 36kA and YA3J 65kA 3-pole electronic MCCBs to be fitted as outgoing devices.

The conversion will be done as an in-house rework and the finished MCCB Panel board will be labeled with the new product code which…

SEMH School Ipswich

We have been working with design and build M&E contractors for contracts in Ipswich and Bristol.

We have engineered solutions with the customer prior to the order being placed. Technical support is offered throughout the project cycle. Quality is assured with our Factory Built Assemblies; we are compliant with the latest regulations and final drawings are signed off prior to the…

Export order for Bangladesh contract

This project was managed by our Bangladeshi distributor, our technical/estimating department at Preston and built by one of our switchboard builders in Chester.
B&S Group are based in modern premises in Chester. They also work in the Power, Utilities, Renewable Energy, Industrial, Transport, Construction, Retail, Distribution and Marine sectors. For more information on B&S www.bsgroupltd.com
The Modis 25/32 switchboard system was used…

Quality Achievement for Dorman Smith Team

Dorman Smith Switchgear Limited are pleased to announce that we have achieved our ISO 9001:2015 Quality Management Certification. All employees at the business have worked together in order to achieve this certification goal. Over the past few months we have been analysing and improving our processes to build a Quality Management system which allows for an environment of continuous improvement,…

LoadPro now available with built in Surge Protection

Dorman Smith are pleased to announce the launch of the new LoadPro range of Consumer Units fitted with a surge protection device to meet the 18th edition requirements for transient over voltage protection in the UK.

The units have all of the features and benefits of the standard LoadPro units with the addition of an integral Type 2 SPD fitted and…

A&R Engineering Business Acquisition

We are pleased to announce the acquisition of the assets of A & R Engineering Ltd from Aquatronic Group Management PLC effective 1st March 2019.

It is intended that under Dorman Smith, A & R Engineering will operate as an independent business unit and continue to grow with their existing and new customers. A & R Engineering Ltd will become “A…